fbpx Skip to content
decorative dot pattern decorative dot pattern decorative dot pattern decorative dot pattern decorative triangle pattern decorative triangle pattern decorative dot pattern decorative line pattern

Order Selector

 

Apply Now

Screen Shot 2020-08-25 at 2.23.37 PM
decorative dot pattern decorative dot pattern decorative dot pattern decorative triangle pattern decorative triangle pattern decorative triangle pattern

Order Selector in Shelbyville, IN

Responsibilities:

  • Picking case quantities in a cold environment -30 (F) – + 34 (F)
  • Selectors will walk and use Pallet Jacks/Walkie Riders
  • Use headsets to get directions and orders on what to pick in what aisle spoken to you in English but you can customize the headset to get used to your voice so you can respond in any language. *Headsets are a smart system and get to know who you are
  • The extremely fast-paced environment and must be very observant and pay close attention to details and traffic
  • The most strenuous job you can do will take 3-4 weeks to get physically accustomed to.
  • The heavy lifting of items up to 95 lbs. on your own * average box weight is 26lbs
  • It could be a light case of yogurt weighing 5lbs but you will want to grab 2-3 at a time in order to keep up your production
  • standing, walking around the facility, riding powered equipment, picking, packing
triangle pattern

Requirements:

  • Clothing should be clean and free from excessive rips/tears/stains
  • Safety shoes/boots should be worn, which have a composite toe. (All footwear should be ANSI or ASTM certified. Footwear must be a high top, leather upper, with a slip-resistant sole. In addition, the footwear must be ANSI or ASTM certified)
  • All employees will work in conditions of -30 (F) – + 34 (F) (you will adjust quickly to these temps)
  • Client will provide you with a freezer suit, jacket, bibs, and hats (won’t do freezer until week 7)
  • Previous experience as pallet jack operator or RF selector preferred not required

Pay rate:

$19 an hour

Shift:

  • 2nd shift 1pm-9:30pm
  • 3rd shift 11:55pm- 8:30am
decorative triangle pattern decorative triangle pattern